Carbon Accounting for Tier 1 Civil, Building and Construction

A Tier 1 civil project pushes the highest-density document workload of any Australian reporting sector — batching-plant dockets from Boral and Holcim, InfraBuild steel invoices, fuel-card statements from Ampol and BP, subcontractor claims that bundle fuel and plant into one line, waste weighbridge tickets, and JVs everywhere. This hub is the practitioner content for the people running that reporting.

Start here

All articles (27)

Frequently asked questions

What emissions does a Tier 1 construction project have to report?

Scope 1: diesel combustion in plant, AdBlue, LPG for site heaters. Scope 2: temporary site power (grid or generator), site compound electricity. Scope 3: purchased materials (concrete, steel, aggregate, timber, asphalt), upstream transport, waste disposal, subcontractor fuel where you have operational control. If the project is under ISCA IS Rating or Green Star, an embodied-carbon assessment is separate from the operational report but feeds the same ledger.

How do JV emissions get allocated?

Three methods concurrently: operational control (100% to the operator, standard NGER treatment), financial control (voting share), and equity share (economic interest). Carbonly runs all three on the same underlying data. Same activity data, three views. That is how the NGER return, the AASB S2 disclosure, and the board pack all reconcile.

Is Carbonly built for construction?

Construction is the primary sector because a Tier 1 site is the hardest technical case: multi-supplier fuel dockets, batching-plant concrete, subbie invoices, JVs and multiple projects on the same reporting entity. The document engine is built against that case. If it holds up there, it holds up for a REIT portfolio or a hospital group.

How does per-project pricing work for construction?

A workspace for the head contractor at A$100 per month, plus a project licence per active site sized Small, Medium, Large or Enterprise. You can run five Small site licences, two Large licences, and one Enterprise licence for a flagship JV all in the same workspace. The whole sustainability team is included at no extra cost.

Related topics

Ready to see it with your own data?

Bring one invoice, docket or bill. In 30 minutes we show what Carbonly reads from it, the factor each line matches and the trail an auditor would follow. Book a 30-minute call or email hello@carbonly.ai.