One Supplier Invoice Covering Several Projects: How to Split the Emissions

Split a multi-project supplier invoice by where each delivery went, using the quantity on each docket line. Here is the order of evidence to use, how fees and credits change the answer, a worked concrete example, and what to do when a line names no project.

Carbonly.ai Team November 22, 2026 8 min read
Scope 3Scope 1Construction EmissionsProject ReportingSupplier InvoicesAudit Trail
One Supplier Invoice Covering Several Projects: How to Split the Emissions

Split the emissions by where each delivery went. Most multi-project invoices list dockets or lines, and each one names a site, a job number or a delivery address. Give each line's quantity to that project, then apply the emission factor. Use the dollar split from your cost coding only for lines with no delivery detail, and label those lines as allocated.

A concrete, quarry or fuel supplier rarely sends one invoice per project. It sends one statement a month for the whole account. Accounts payable codes the dollars to jobs, and the emissions often get split the same way. That is where project figures start to drift.

We build carbon accounting software that reads supplier invoices and dockets, and multi-project invoices are one of the most common documents it sees. This post covers how to split one, line by line, and how to keep the split defensible.

Why the dollar split gives the wrong project numbers

Emissions follow physical quantities: cubic metres, tonnes, litres. Dollars follow price. On a multi-project invoice the two come apart for three reasons.

Prices differ between projects. A 40 MPa mix costs more per cubic metre than a 25 MPa mix, and a remote site pays more freight. A dollar split gives the expensive project too much of the concrete.

Fees carry dollars and no material. Pump hire, short-load fees, waiting time and after-hours charges sit on the same invoice as the concrete. They belong to a project's cost. They add nothing to its material quantity.

Credits are lumpy. A returned load or a pricing credit can land on a later invoice, against a different line. If you split by dollars, the credit spreads across every project. It belongs to the one that returned the load.

Your company total is the same whichever way you split. The project figures are what change, and those are the numbers that go to clients, JV partners and project targets.

The order of evidence for the split

Work down this list for each line on the invoice. Stop at the first source that answers the question.

1. The project on the docket line. Most supplier systems print a delivery address, site name or customer job number against each docket. This is the strongest evidence because the supplier recorded it when the truck was dispatched.

2. Your purchase order or job number. If the line carries your PO and each PO was raised for one project, the PO tells you where it went. Check that nobody raised a blanket PO across several jobs.

3. The supplier's dispatch report. When the invoice lists docket numbers and nothing else, ask the supplier for a delivery report for the period. It maps each docket number to a delivery address. Most suppliers can run one from the same system that printed the invoice.

4. Your own site records. Site diaries, pour records and plant logs often name the docket or the delivery. They are slower to search, so use them for the few lines the first three sources don't settle.

5. An allocation key, labelled. If none of the above answers it, allocate the line using a documented key. Your cost coding is one option. A share of planned quantities is another. Mark the line as allocated and keep the key with your working papers.

The first three sources come from the supplier and should cover most lines. The fifth should be the exception. If it covers a large share of a material, that is worth fixing with the supplier before the next period.

A worked example: one concrete invoice, three projects

A supplier's monthly invoice shows nine dockets and three other lines. The dockets name three delivery addresses.

Line Delivery Quantity Amount
Dockets 1 to 4, 32 MPa Project A 120 m3 $33,600
Dockets 5 to 7, 40 MPa Project B 60 m3 $19,800
Dockets 8 and 9, 25 MPa Project C 30 m3 $7,500
Pump hire Project B none $4,200
Short-load fees Project C none $900
Credit, returned load, 32 MPa Project A minus 6 m3 minus $1,680

Split by quantity, Project A has 114 m3 (120 less the 6 m3 credit), Project B has 60 m3 and Project C has 30 m3. That is 204 m3 in total, which matches the invoice's net concrete quantity.

Split by dollars, the picture shifts. Project B carries the pump hire and the dearer mix, so its share of the dollars is larger than its share of the concrete. Project C's short-load fees do the same on a smaller scale.

The mixes also differ. A 40 MPa mix usually carries a higher emission factor per cubic metre than a 25 MPa mix, because it contains more cement. So each line also needs its own factor, chosen from the mix on the docket. A single average factor across the invoice would blur the difference between projects.

If a docket shows only cubic metres and your factor is per tonne, you need a density to convert. Record which density you used and where it came from, because it changes the answer.

Lines that name no project

Some lines will never carry a delivery address. Three cases come up often.

Deliveries to a yard or depot. Diesel delivered to a bulk tank at a depot, then moved to sites in a fuel truck, shows the depot on the invoice. The project split lives in your fuel issue records or plant logs, not on the supplier's document. Use those records, and treat what can't be traced as depot use.

Account-level charges. Monthly account fees, environmental levies and fuel surcharges sometimes appear as one line for the whole account. If they carry dollars and no quantity, they carry no material emissions to split.

Shared site supplies. A delivery to a compound shared by two adjacent projects needs a rule. Pick one, such as a share of planned pours or of site hours, write it down and apply it the same way every month.

Whatever the rule, apply it consistently. A split that changes method from month to month is harder to explain than one that is a little rough but stable.

Check that the split adds back

Before the period closes, check two things for each multi-project invoice.

The project quantities should add up to the invoice quantity for each material. A gap means a line was missed or counted twice.

Credits should sit on the project that earned them. A credit that lands on a later invoice still belongs to the project that returned the load. Find the original docket number on the credit line and follow it back.

If a project is a joint venture, the split also decides what enters consolidation. Your share then depends on the approach you use: operational control, financial control or equity share. Get the project figure right first, then apply the approach.

For AASB S2, paragraph 29(a)(iii) asks for the measurement approach, inputs and assumptions. In our reading, an allocation key used for lines with no delivery detail is one of those assumptions. Keep a note of which lines were allocated and how.

Where Carbonly fits

Carbonly is designed to read supplier invoices and dockets and to create one record per docket on a multi-docket invoice. Each record keeps the verbatim line text as evidence, so the delivery details on a docket stay with the quantity they describe.

Fee, hire, time and dollar-only adjustment lines, such as pump hire or short-load fees, are skipped, so they add no material quantity. Credit lines with negative quantities reduce the total. A line that can't be converted without an unstated figure, such as cubic metres to tonnes with no density, goes to a reviewer. For JV projects, the platform supports consolidation under operational control, financial control and equity share.

If you want to see how your own multi-project invoices would come through, we can run a few of them in a trial beside your spreadsheet.

FAQ

How do I split one supplier invoice across several projects for emissions? Use the quantity on each docket or line and the project it was delivered to. The delivery address, site name or job number on the line is the strongest evidence, because the supplier recorded it at dispatch. Apply the emission factor to each line's quantity. Use a dollar or other allocation only for lines with no delivery detail, and label them.

Can I split invoice emissions by cost coding instead? You can for lines that carry no delivery detail. For the rest, cost coding follows price, and prices differ between projects, mixes and freight zones. Fee lines and credits also distort a dollar split. Quantity by delivery gives a more accurate project figure.

What do I do with pump hire and other fees on a concrete invoice? Leave them out of the material quantity. Pump hire, short-load fees and waiting time carry dollars and no cubic metres. They belong in the project's cost and add nothing to its concrete emissions.

Where does a credit for a returned load go? To the project that returned the load. Find the original docket number on the credit line and follow it back. Spreading a credit across every project on the invoice leaves the project that returned the load overstated and understates the others.

What if the invoice lists docket numbers but no delivery addresses? Ask the supplier for a delivery report for the period. It maps each docket number to a delivery address. Site diaries and pour records can settle the rest. Allocate only what remains, using a documented key.

Related reading

Related articles

Supplier invoices turned into Scope 3 line items you can show an auditor

Bring one subcontractor invoice, concrete docket or freight bill. In 30 minutes we show the quantities Carbonly reads from it, the factor or EPD each line matches, and the source document behind every tonne.

Book a 30-minute call Prefer email? hello@carbonly.ai

Per-project pricing, no per-seat fees. We reply within business hours.