electricity Scope 2 (Indirect)

Electricity - New South Wales (NSW)

Grid electricity emission factor for New South Wales. This factor represents the greenhouse gas intensity of electricity consumed from the NSW grid, reflecting the state's energy mix of coal, gas, solar, wind, and hydro generation.

Emission Factor Value

0.6

kg CO₂-e/kWh

The number this factor multiplies: kWh off your electricity bill

Use metered consumption in kWh for each site and billing period, from the retailer bill or the interval data behind it. Demand charges in kW or kVA are not consumption.

Bills rarely end on 30 June. A bill that straddles year end needs splitting between years, and your method note should say how you split it.

Read next: How to calculate Scope 2 from electricity bills

Questions about this factor

What is the emission factor for electricity in NSW?

The Scope 2 emission factor for grid electricity in New South Wales is 0.60 kg CO₂-e per kWh under the NGA Factors 2026 published by DCCEEW, which applies to activity from 1 July 2026. For the 2025-26 reporting year the NGA 2025 value of 0.64 applies.

How do I calculate my electricity emissions in NSW?

Multiply your total electricity consumption in kWh by 0.60 to get your Scope 2 emissions in kg CO₂-e under NGA 2026. For example, 10,000 kWh × 0.60 = 6,000 kg CO₂-e. Use 0.64 for the 2025-26 reporting year.

Does the NSW electricity emission factor include renewable energy?

Yes, the factor reflects the average grid mix including coal, gas, solar, wind and hydro generation in NSW. If you purchase GreenPower or surrender LGCs, you may use the market-based method instead.

← Back to all emission factors

Get the quantities this factor multiplies, read off your own documents

Looking up a factor takes seconds. Getting the quantity off a concrete docket, a subcontractor invoice or a freight consignment, and proving later where it came from, is where Scope 3 reporting for AASB S2 breaks. Carbonly reads physical quantities off supplier documents, matches each line to an NGA or construction EPD factor, and keeps every number traced to its source document. Why Scope 3 breaks.

See it on your own invoices

Per-project pricing. Reply within business hours. Prefer email? hello@carbonly.ai